







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Fast, Reliable Home Additions & ADU Across Boulder City
Adding a room or an ADU to a Boulder City house is a different job than building one in a new subdivision. Most of the homes here went up between the 1930s and 1950s to house Boulder Dam workers, and the work today is fitting new square footage onto a small stucco-and-block shell that has already carried a family for several decades. We know the 89005 and 89006 blocks, the historic district review process, and what a wind-rated connection to an old wall actually takes. Call (833) 954-5920 to schedule a free estimate.
Why Rowan Construction Group Henderson Is Boulder City’s Preferred Home Additions & ADU Company

Boulder City homeowners tend to read the three-star reviews before they call anyone. We show our work instead of asking for trust. Every Boulder City project gets a written price and written scope before a tool comes off the rack, a signed change order before any change proceeds, and a documented photo record of what we found and what we finished. That record matters here more than in most cities, because an addition on a Boulder Dam-era house is only as good as the paperwork that proves it was built right.
Our technicians have up to 19 years of experience, and they’re background-checked and uniformed before they ever reach your curb. A live person answers the phone around the clock, so a question about a framing inspection or a permit correction doesn’t wait until Monday. We’re licensed for the trade, and the 365-Day Done Right Promise is printed on every page of our paperwork, backed by a terms page rather than an asterisk. If a competitor hands you a written estimate, we’ll review it line by line at no charge as a free second opinion before you sign anything.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Home Additions & ADU Services in Boulder City
ADU Design & Permitting
An accessory dwelling unit – a second, self-contained home on your lot – needs a design that satisfies the city’s review process before the first permit is issued. Because Boulder City’s growth boundary is fixed, an ADU is often the only way to add living space on an existing parcel, so the design has to work within the setbacks and lot coverage you already have. We handle the plans, the submittals, and the inspection sequence so nothing gets built against a stamp that won’t come.

Garage Conversion ADU
Converting a detached or attached garage into an ADU is the lowest-cost route for many Boulder City lots. The catch is the foundation. A shallow slab poured decades ago for a car isn’t automatically rated for a dwelling, so the floor, tie-downs and insulation get checked before the walls close up. A garage conversion in Boulder City typically runs $30,000 – $80,000 depending on how much of the shell can stay and how much of the utility work is new.

New Detached ADU
A detached ADU is a full small house on your property, with its own foundation, envelope and utility connections. Here the wind-load and stucco detailing that we treat as the make-or-break issue on any addition becomes the entire building. Site drainage matters too, since monsoon-season flash flooding in the washes has to be graded so water leaves your lot the way the city expects. Budget $90,000 – $220,000 for Boulder City construction.

Junior ADU & Interior Conversion
A junior ADU – a smaller unit built inside the existing house, often from a spare bedroom – skips the new foundation and puts the engineering into the tie-in. On a 1940s house, that tie-in is where the real work lives. The same structural attachment question that governs a full addition governs a junior ADU conversion, which is why we treat these projects like the engineering jobs they are rather than simple remodels.
Trusted Brands We Service in Boulder City
Envelope products on a Boulder City addition get specified the same way we specify everything else: named, not implied. We work with window and glazing lines including CWS and ES Windows when a project needs impact-rated assemblies at the new-to-old wall, and Mr-Glass when a specific opening calls for a custom fit. We don’t stock parts and we don’t claim a local warehouse. What we do is quote the exact product, the exact rating, and the exact install method so you can compare it against any other bid. When a manufacturer calls out a spec, we put it in writing.
Common Home Additions & ADU Problems We See in Boulder City Homes
The failure modes on an addition here are consistent, and they’re almost always about the joint between old and new.
- Underbuilt tie-ins that never pass inspection. Cheap quotes skip the engineering and the wind-uplift-rated connectors at the connection to the old wall. Without them the addition fails sign-off and can’t be documented for an insurance claim. A 1940s pier-and-beam or shallow-slab house needs fresh foundation tie-downs and often a load-bearing upgrade before the new framing touches it.
- Historic-district additions built without design-review sign-off. Exterior work near downtown often needs design-review approval before the permit is issued. Skip it and the job gets torn out and re-permitted, which costs more than doing it in order the first time.
- Envelope cracks left in “allowances.” The 100°F-plus summers and relentless UV bake stucco to cracking and dry out roofing membranes and framing. When those repairs hide inside a vague allowance instead of a written line, you find out later, on your bill.
- Drainage and grading shortcuts. Monsoon flash flooding in the washes is real. An addition that changes the grade or covers the natural drainage path needs that worked out on the plans, not discovered in the first storm.
See the difference
Before
After
Before
After
Before
AfterPricing for Home Additions & ADU in Boulder City, NV

A home addition in Boulder City runs $45,000 – $130,000, and an ADU runs $90,000 – $220,000. Those are wide ranges on purpose, because a 400-square-foot room added to a sound slab is a very different job from a full accessory unit that needs its own foundation, envelope and utilities. The line items below are the ranges we quote against in Boulder City’s 89005 and 89006 markets.
| Project | Typical Boulder City Range |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
What moves the number is the structure underneath. A qualified local general contractor sequences the rough-in, the framing inspection and a documented exterior envelope rated for wind uplift, then sets a draw schedule against the written scope and allowance list. We deliver a written price before work starts, and no change proceeds until the change order is signed. Call (833) 954-5920 for a free estimate – we’ll bring a written second opinion on any competitor’s quote at no charge.
We Also Serve Cities Near Boulder City
Our Home Additions & ADU team covers Boulder City and the surrounding area, including Henderson, Whitney, Paradise and Enterprise. If you’re just outside the 89005 and 89006 ZIPs and wondering whether we reach you, call and ask. We’ll tell you plainly. You can also read more about Home Additions & ADU in Boulder City on our city page.
Serving Boulder City, NV – Our Local Coverage Area
We serve Boulder City and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Home Additions & ADU in Boulder City

It makes an ADU the most common way to add living space here, because the 1998 Boulder City Bill capped the city’s growth boundary and new subdivision lots aren’t coming. That means the design has to fit the setbacks and lot coverage you already own, and the review process is built around infill rather than new tracts. Call (833) 954-5920 for an exact quote – estimates are free.
Yes. Exterior additions in the historic district around downtown typically require design-review sign-off before the permit is issued. Build before that approval and the work gets torn out and re-permitted. We sequence the review into the schedule so it happens in order. Call (833) 954-5920 to talk through your block.
A compliant quote names the engineering and wind-uplift-rated connectors at the tie-in to the old structure, the envelope spec, and a written allowance list – the cheap bid usually omits at least one of them. It also carries a signed change-order process and a documented photo record. Those are the items that decide whether your job passes inspection and how it prices out later. Call (833) 954-5920 for a written quote with every line spelled out.
Because an addition that can’t be documented as built to code can’t be defended in a claim. Wind-load and structural ratings that live only in the contractor’s head are worthless when the insurer asks for proof after a storm. The photo record, inspection sign-offs and written scope are what carry the file. We hand you that record as standard, not as an upgrade – call (833) 954-5920 to set up a free estimate.
Summer highs routinely top 100°F with intense UV and very low humidity, so concrete pours and exterior envelope work get scheduled for early morning before the sun gets brutal. It’s not a detail we can skip; stucco and membranes cure differently in that heat, and rushing a pour costs more than slowing the schedule. We build the calendar around the climate here. Call (833) 954-5920 to plan your project’s timing.
Let’s Put a Written Number on Your Addition
Whether you’re planning a second-story addition on a 1940s bungalow near downtown or a detached ADU on a lot inside the frozen boundary, the estimate comes first and it comes in writing – scope, price and warranty, every time. Our technicians have up to 19 years of experience, they’re background-checked and uniformed, and a live person answers the phone around the clock. Call (833) 954-5920 for a free estimate on your Home Additions & ADU project in Boulder City.
Written by the team at Rowan Construction Group Henderson.












