







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Home Additions & ADU in Henderson, NV
A home addition in Henderson typically costs $45,000 – $130,000, and a detached ADU runs $90,000 – $220,000, with garage conversions sitting between at $30,000 – $80,000. Those numbers are for the finished job, permits and inspections included. On an older Green Valley or Anthem house, the number that actually moves is the one nobody can see until the walls are open: wiring, framing, waterproofing, and the code upgrades a permit pulls into the light. We price all of it in writing before the first cut. Call (833) 954-5920 to schedule a free estimate.
Why Rowan Construction Group Henderson Is Henderson’s Preferred Home Additions & ADU Company

Henderson homeowners research contractors the way they research appliances, and they should. What they find here is a written price before work starts, a scope that names the trades and the brands, and a signed change order required for anything that changes. No work moves forward on a verbal yes.
Our technicians have up to 19 years of experience, and crews are background-checked and uniformed. Every visit includes a documented photo record as a standard deliverable, not an upgrade. That record matters most on additions, where the condition of the existing structure is the whole story and you deserve to see what we saw.
Henderson calls get answered by a live person around the clock. We also offer a free second opinion on any written estimate, so if you’re holding a competitor’s quote for an ADU off Lake Mead Parkway or a second story in Seven Hills, bring it in and we’ll review it line by line at no charge.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
Our Home Additions & ADU Services in Henderson
Henderson’s addition work splits into two jobs that look similar on paper and behave completely differently: building new square footage, and converting what’s already there. Our Home Additions & ADU team handles both, plus the permitting in between.
ADU Design & Permitting
Henderson’s municipal push for drought-resilient, energy-efficient rebuilds goes further than Clark County or Las Vegas enforce, and an ADU plan set has to reflect that before it goes to the counter. We coordinate design, site plan, and the permit package together so the energy and water requirements are resolved on paper rather than rediscovered at inspection. Zoning, setback, and utility capacity get checked first, because those decide whether a detached unit is even possible on your lot.

Garage Conversion ADU
A garage conversion in Henderson runs $30,000 – $80,000 and is the fastest route to rentable or family-ready square footage, since the slab, walls, and roof already exist. What the conversion typically forces is a new load path where the garage door was, plus electrical and insulation brought to habitable-room standard. On older Green Valley homes with original aluminum branch wiring, that electrical work is the line item that grows.

New Detached ADU
A new detached ADU costs $90,000 – $220,000 in Henderson and is a ground-up build: slab, framing, roof, utilities trench, and full inspection sequence. On the foothill lots in Anthem and Seven Hills, grading and slope stabilization come before the slab, and the monsoon season between July and September makes drainage design a structural question rather than a cosmetic one.

Junior ADU & Interior Conversion
An interior conversion carves a junior ADU or in-law suite out of existing square footage, often a den or an oversized primary suite. The trade-off is plumbing and egress: a kitchenette and a bathroom need drain runs and a code-compliant exit, and in 1990s tract housing those runs often cross a wall that was never opened. We scope the rough-in as an allowance so the price reflects the real work.
Trusted Brands We Service in Henderson
Addition work pulls in windows and glazing, and we spec the same names we use across the trades: ES Windows and CWS for impact-rated and energy-rated units, ECO Window Systems for desert-rated assemblies. We don’t stock parts and we don’t claim to. What we do is get the right specified unit ordered, scheduled, and installed, which on a Henderson addition means coordinating window delivery with the framing inspection so the house doesn’t sit open. Naming the brand in the scope keeps the written quote honest rather than inflated.
Common Home Additions & ADU Problems We See in Henderson Homes
- Aluminum branch wiring surfacing mid-rough-in. Older Green Valley homes often still carry original aluminum branch circuits and builder-grade panels. Once the wall is open for an addition, the permit inspection triggers arc-fault and load calculations the homeowner never budgeted for.
- Framing that was never sized for a second-story load path. A 1990s tract home was engineered for the loads it has, not the ones you’re adding. Second-story work means verifying the existing structure can carry the new floor before the framing package is priced.
- Failed waterproofing and grading on foothill lots. Anthem and Seven Hills lots move water in monsoon season. When we open up for an ADU slab or addition footing, we sometimes find grading that has to be corrected and waterproofing that has to be redone first.
- Rebate-driven projects with an unpermitted patio cover. Henderson’s turf-removal rebates are among the most generous in the country, and the ramada, patio cover, or outdoor kitchen that follows the desert landscaping often gets built without its own permit, which stalls the final inspection on the whole addition.
See the difference
Before
After
Before
After
Before
AfterPricing for Home Additions & ADU in Henderson, NV

Here’s the number, before you call. A home addition in Henderson runs $45,000 – $130,000 depending on square footage, whether it’s a second story, and how much of the existing structure needs upgrading to carry it. ADU construction runs $90,000 – $220,000, with detached units at the top and interior conversions at the bottom. A garage conversion is $30,000 – $80,000. What moves the number within those ranges is the condition of what we find once we inspect: wiring, framing, waterproofing, and the code upgrades the permit requires.
| Service | Typical Henderson Range |
|---|---|
| Home Addition | $45,000 – $130,000 |
| ADU Construction | $90,000 – $220,000 |
| Garage Conversion | $30,000 – $80,000 |
Under Clause 1 of The Haven Standard, the price is written before anyone starts. We inspect the existing structure before pricing, write the likely rough-in and wiring upgrades in as allowances in the scope of work, and price any genuine surprise through a signed change order before demo continues. That process is how projects finish within a few percent of the agreed cost. Call (833) 954-5920 to schedule your free estimate.
We Also Serve Cities Near Henderson
We work throughout Henderson and the surrounding communities, including Boulder City, Whitney, Paradise, and Enterprise. The same inspection-first process applies across all of them: walk the structure, write the allowance, price the surprise in writing. If you’re just outside the Henderson line, call and we’ll confirm coverage for your address.
Serving Henderson, NV – Our Local Coverage Area
We serve Henderson and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
FAQs – Home Additions & ADU in Henderson

Because the structure you can see from the outside rarely tells you what’s inside a 1990s tract home. Opening a wall for an addition often turns up original aluminum wiring and builder-grade framing that was never sized for the load you’re adding, and the permit inspection triggers arc-fault and load-bearing upgrades the homeowner never budgeted for. On Anthem and Seven Hills foothill lots, the same opening often reveals failed waterproofing and grading corrections that have to happen before the new subfloor goes down. The fix is procedural: we walk the existing structure before pricing, write the likely rough-in and wiring upgrades in as allowances, and price any genuine surprise through a signed change order before demo continues. Call (833) 954-5920 for an exact quote; estimates are free.
Yes, and more often than homeowners expect, because a large share of addition and ADU projects here start not as a room but as a lawn conversion. Henderson’s water authority pays some of the country’s most generous turf-removal rebates, so the sequence often runs landscape first, then the patio cover, ramada, or outdoor kitchen, and then the ADU slab. The catch is that the patio cover and outdoor kitchen usually need their own separate permit and inspection sign-off before the ADU slab can even be laid out. Build the outdoor structure unpermitted and the final inspection on the whole addition stalls. Call (833) 954-5920 and we’ll sort the permit sequence before your project starts.
A load path verification and, usually, structural reinforcement of the existing walls and foundation to carry the new floor. A 1990s stucco-and-tile tract home in Green Valley was engineered for the loads it already has, not for a second story on top. Beyond framing, plan on a structural engineer’s review, upgrades to the electrical panel and circuits, and coordination of the roof tie-in so the new roofline sheds Henderson’s monsoon rain correctly. The extreme desert heat and intense UV also mean the new roof assembly needs desert-rated materials, not the builder-grade layer that’s already up there. Call (833) 954-5920 for a free estimate that scopes the structural review up front.
They add a grading and waterproofing phase before the slab can be poured. Henderson’s monsoon season runs July through September and brings flash-flood risk, and on the foothill lots of Anthem and Seven Hills that water has to be directed somewhere rather than pooling against a new foundation. We look at the grade before we price the ADU, correct slope and waterproofing issues, and get the drainage signed off as part of the inspection sequence. Skipping that step is how a finished ADU ends up with water against its footing in the first storm season. Call (833) 954-5920 to schedule a free site estimate.
A written scope, a flat written price, and stated allowances for the work that can’t be confirmed until the walls are open. Specifically: the electrical rough-in allowance (aluminum wiring in older Green Valley homes is the usual culprit), the structural and framing allowance, the waterproofing and grading allowance for foothill lots, and the separate permit for any patio cover, ramada, or outdoor kitchen attached to the project. It should also state that no work proceeds on a change until the change order is signed, and it should carry the written warranty. Call (833) 954-5920 and we’ll review your contract, or the one you were handed, line by line at no charge.
Schedule Your Free Home Additions & ADU Estimate in Henderson
Henderson is at the front edge of its first major remodel cycle. The 1990s and 2000s tract homes in Green Valley, Anthem, and Seven Hills are opening up for the first time, and what’s behind those walls decides the budget. We inspect before we price, put the allowances in writing, and hold the price with signed change orders. That’s the 365-Day Done Right Promise behind every job: if it’s not done right, we make it right. Call (833) 954-5920 to schedule your free estimate.
Written by the team at Rowan Construction Group.












